Canada-wide field delivery
Pallet racking installation, relocation + teardown across Canada
Move from approved layouts to a defined field sequence for new installation, reconfiguration, relocation, or controlled removal.
Before crews reach the floor
Define the work, conditions, interfaces, and acceptance path
A reliable field plan separates verified site conditions from open assumptions. The exact installation, relocation, or teardown sequence depends on the approved design, the equipment involved, active operations, and project-specific review requirements.
Review project management- 01
Approved layout + scope
Current drawings, system details, quantities, elevations, locations, work limits, exclusions, and approved changes.
- 02
Existing system condition
Manufacturer or component information, compatibility, damage, missing parts, previous modifications, and items requiring review.
- 03
Slab + anchoring conditions
Available slab information, anchoring requirements, embedded services, scanning needs, floor condition, and known restrictions.
- 04
Access + site logistics
Delivery route, staging, lift equipment, work hours, occupied areas, pedestrian and vehicle interfaces, and other trades.
- 05
Sequence + continuity
Phasing, temporary storage, shutdown windows, inventory movement, dependencies, and the operations that must remain active.
- 06
Verification + closeout
Inspection points, documentation, deficiencies, approvals, turnover information, and the party responsible for each decision.
The field delivery path
Take approved project information from preparation to handover
Field work should follow the project-specific drawings, manufacturer information, site requirements, and professional or jurisdictional reviews applicable to the work.
Confirm the Field Scope
Review drawings, quantities, system information, site conditions, responsibilities, open decisions, and required approvals.
Ready the Site
Coordinate access, staging, deliveries, equipment, work zones, other trades, operating interfaces, and any pre-installation checks.
Install or Disassemble
Complete the defined assembly, anchoring, reconfiguration, dismantling, relocation, or removal sequence within the agreed work limits.
Review the Completed Work
Check the completed scope, identify deficiencies or open items, and coordinate the inspection or professional review required for the project.
Close the Field Package
Resolve defined deficiencies and assemble the drawings, records, approvals, turnover information, or next actions included in scope.
Where field delivery fits
New installations, active-site changes, relocations, and removals
Installation and teardown can be a standalone field scope or one stage of a larger warehouse project. The sequence should reflect the system, site, operations, equipment, documentation, and decisions in front of it.
Connected project services
Resolve the information and field dependencies around the work
Select the connected service that must be defined before, during, or after field delivery.
Design + Layout Engineering
Develop the layout, assumptions, elevations, equipment requirements, and project information needed to define the installation scope.
→Project Management
Connect drawings, decisions, product, deliveries, site readiness, trades, schedule, field work, deficiencies, and closeout.
→Concrete Scanning + Anchoring
Identify available slab information, embedded-service risks, scanning scope, anchoring requirements, and site restrictions.
→Rack Safety + Compliance
Define the inspection, engineering, documentation, deficiency, and approval path applicable to the completed work.
→Buyback + Decommissioning
Plan system identification, removal scope, dismantling, material handling, reuse or buyback review, and final site condition.
→Frequently asked questions
Planning installation, relocation, or teardown
Start with the work required, the system involved, the site conditions, and the information currently available.
What information is needed before pallet racking installation?
Useful starting information includes the approved layout, elevations, system or component details, quantities, load information, site photos, slab information when available, anchoring requirements, access constraints, delivery and staging needs, operating restrictions, schedule targets, and the project-specific inspection or approval path. Missing information can be identified during scope review.
Can Pac Rac install existing or pre-owned racking?
Existing or pre-owned systems can be reviewed for installation, reconfiguration, or relocation. Suitability depends on component identification, condition, compatibility, available documentation, the proposed configuration, load requirements, and any engineering or professional review required for the project.
How is a pallet racking teardown planned?
A teardown plan should define the system and quantities, current condition, work limits, inventory and operational interfaces, equipment and access, dismantling sequence, staging, transport or disposal route, intended reuse, documentation needs, and the required final site condition.
Can installation or teardown be phased around active operations?
Phased work may be possible when the site can support safe work zones, access, staging, inventory movement, shutdown windows, equipment interfaces, and coordination with operating teams and other trades. The workable sequence must be established for the specific facility and scope.
When is concrete scanning needed before anchoring?
Scanning may be required when slab information is incomplete, embedded services or reinforcing could conflict with anchors, the site or project specification requires it, or the proposed anchor locations create uncertainty. The scanning and anchoring approach should be defined from available site information and project requirements.
What happens at installation closeout?
Closeout can include completion review, defined inspections, deficiency tracking, corrections, turnover documentation, drawings or records included in scope, approvals when applicable, and a clear list of remaining responsibilities or operational next steps.
Have drawings, photos, quantities, or a site date?
Define the field scope before equipment reaches the floor
Send the information currently available. Pac Rac can identify the open inputs, connected services, and practical next step for installation, relocation, or teardown planning.
Plan the field work